How to specify UHPC tiles and panels: a checklist

Specifying UHPC well means being clear on performance, appearance and evidence. Use this checklist to brief manufacturers and compare proposals on a like-for-like basis.

1. Define the application

  • Location: interior wall, floor, facade, terrace, wet area
  • Area in m², panel sizes and any special shapes
  • Building height, exposure and use class

2. Set performance requirements

  • Minimum flexural and compressive strength (with test standards)
  • Reaction-to-fire classification
  • Freeze–thaw and water absorption requirements for external use
  • Slip resistance for floors and wet areas
  • Wind load and fixing requirements for facades

3. Define appearance

  • Colour, finish and texture references
  • Acceptable variation, agreed with physical samples
  • Joint widths and layout
  • Mock-up requirements for large projects

4. Request documentation

  • Technical data sheets and declarations of performance
  • Fire classification reports
  • Structural calculations and fixing details
  • Installation, maintenance and warranty documents
  • EPDs if sustainability reporting is required

5. Plan procurement

Allow time for samples, mock-ups and production lead times, which are often longer for custom products. Order from a single production run where possible for colour consistency. When you are ready, send us your brief and we will connect you with suitable manufacturers.

Performance vs prescriptive specifications

A performance specification states what the product must achieve (strength, fire class, slip resistance, appearance) and lets suppliers propose solutions. A prescriptive specification names a product. Performance specifications encourage competition; prescriptive ones give certainty on appearance. Many projects use a hybrid: performance requirements plus a named reference product “or equivalent approved”.

Common specification pitfalls

  • Specifying strength without the test method
  • Approving colour from a single small sample
  • Forgetting fire classification for the sealed product
  • Not allowing time for mock-ups and custom development
  • Leaving fixing design responsibility unclear

Who does what

Clarify responsibilities: who designs the fixings, who checks structural calculations, who produces panel schedules, and who approves samples. Clear responsibilities prevent delays and disputes later.

A simple timeline

  • Concept: hand samples, indicative pricing, feasible sizes
  • Developed design: fixing strategy, facade engineer, fire evidence
  • Technical design: panel schedules, calculations, specification
  • Pre-construction: sample range approval, visual mock-up
  • Construction: production, delivery, inspection, installation

Frequently asked questions

Should I name a specific UHPC product?
Naming a reference product helps define appearance, but allowing approved equivalents can improve price and availability.
When should manufacturers be involved?
As early as possible — ideally at concept or developed design — so panel sizes, fixings and costs are realistic.